Construction Zone

We are now in the midst of a construction zone at our house.  We are getting a new kitchen!  Anyone who has seen our kitchen knows just how badly we need this.  The timing is probably horrible, the expense not one we want to undertake, the inconvenience annoying but the outcome will be fantastic!  We made our falling apart kitchen work for 5 years, but this summer and fall were the end of the making it work.  We were having big plumbing problems, the dishwasher handle broke so that we had to use a wooden spoon to pry it open and we have been living with falling apart cabinets.  We had no drawer front on our utensil drawer and more than one cabinet door didn’t shut and was unrepairable.  It was time!

For nearly two years I have been searching for used cabinets on craigslist.  We have a tiny kitchen, so I’ve been convinced that I could find cabinets for a good price.  I finally did.  The whole buying the used cabinets, picking them up and getting them into a storage unit was a bit of a disaster.  Travis must really love me, ’cause he puts up with all my crazy “good deal” purchases and usually is the one transporting or putting said purchases together.  This is not his idea of a good time, but he endures none the less!  Anyway, I got a kitchen full of cabinets plus a free-standing wine bar for $600.  The cabinets are nice and in good condition.  A real buy!!

We started demolition two weeks ago.  We did the cabinet removal ourselves.  I sold all of our appliance, with the exception of our new (last Christmas) refrigerator, on Craigslist.  We couldn’t remove the sink cabinet because their was no way to shut off the plumbing.  Just one more reason we had to redo this room.  We were planning to patch the drywall where necessary, put in better lighting, add some outlets, fix the plumbing and then put in a new tile floor, cabinets, appliances and a tile backsplash.  Of course, once the cabinets were out we found several crude holes where old plumbing had been removed, or not removed at all and instead was exposed pipes open to the outdoors but not capped.  After a little digging around, it was clear the drywall had to come down.  Turns out, there was drywall on one wall but the rest of the kitchen was still plaster with drywall crudely glued to it.  Once the walls were down we could really see all the issues.  Strange plumbing, bad electrical, no grounded electrical in the entire kitchen, old outlets not cut off but just buried in the walls, not to mention the basement electrical and plumbing running to the kitchen. 

We are two weeks into what was estimated to be a two-week job.  We now have all new electrical throughout the kitchen including more outlets and real lighting.  The insulation is almost finished and with any luck, by the end of today we will have drywall.  The floor still needs to come up, a new window and exterior door are on order, the tile is here, the sink and faucet are here and two additional base cabinets are on order.  Turns out when you take down multiple layers of drywall and plaster, you gain more than a few inches of space.  Luckily I figured out what are cabinets were and that they are available still at Home Depot.  A mixed blessing it turns out…two 15 inch drawer bases set me back over $700.  There goes my “good” cabinet deal!  I guess it makes us feel good that the $600 we paid originally was a pretty darn good deal since the supplement of two more cabinets cost us more.!

I’m actually kind of enjoying the whole construction process.  I’m interested in every step and like learning about the electrical and plumbing.  I haven’t enjoyed picking out tile and granite very much.  This isn’t our dream house, so I’ve been trying to pick materials I like and will enjoy but with a generic buyer or renter in mind.  This is pretty tough!  I settled on floor tile, glass backsplash tile and granite.  I’m narrowing down the paint choices.  I’m already itching for the main bathroom to get ripped out.  Travis on the other hand is less than enthused with this process.  He hates the chaos, he doesn’t like construction and has little interest in the process.  He can’t envision the final product and he just feels stress about the whole thing.  After just a few days he declared that he could never do a major addition because he can’t handle the chaos.  Unfortunately for him, we have lots of construction in our future.  We desperately need a new roof and would love to figure out a way to put in a real staircase instead of the dreaded and dangerous spiral stairs.  Construction is in our lives for the forseeable future.  I’ll continue to love the projects and Travis will continue to loathe them…just another reason why we are a good complement of each other!

Advertisements

1 Comment

Filed under Uncategorized

One response to “Construction Zone

  1. Hey—love the kitchen renovation pics! I can’t wait to see the finished product. I will have you over to my new kitchen if you will have me over to your new kitchen. 🙂 Happy weekend!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s